Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 6/14/2016 - P32

Board Of Aldermen - Agenda - 6/14/2016 - P32

By dnadmin on Sun, 11/06/2022 - 21:34
Document Date
Tue, 06/14/2016 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2016 - 00:00
Page Number
32
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

A-1.. Department of. .-Rail Trail kighting., 2) 2°.”

Public Works

(Parks and Recreation) 165,000 165,000

The current lighting on the Rail Trail is in need of replacement. The new lighting would provide improved lighting and
visibility to the area with the update of LED fixtures. Overhead wiring is proposed due to other utilities in the ground.

“* Added at the May 23, 2016 Special Capital Improvements Committee Meeting

A-1._.. Fire Dept ' Municipal FireAlarm . 55,000 55,000

Nashua Fire Rescue maintains the 100 mill-amp system used for the transmission of coded Fire Alarm Boxes. This system
currently monitors/protects in excess of 1.6 billion dollars of assessed community real estate. The goal of this project is to create
an additional pathway to the north end of the city creating redundancies with the system as documented in the NFPA Standards

for Municipal Reporting.

A-2-. Departmentof ——_—Gentralirrigation

s:$ Public Works oa

(Parks and Recreation) 2420000 Ss 420,000

The installation of a central irrigation system would tie jn all of the department's 45 systems into control software that would allow
remote changes to the system. These changes would be based on current weather and soil moisture conditions and would help
conserve water. It is estimated to have a 5-7 year payback with reduced water usage. The system would also allow for single
person control in the field. This would reduce a two person crew down to one person. This would allow for the department to use
this saved manpower on other tasks or projects. This request has been listed in previous years

A-3.. -Department of | _ Ledge Stat Nashua’
>: Public Works Canal. HOCgSeS . ees
(Engineering) , oo 218,000 248,000

This request is to construct a crash rated barrier curb railing along Ledge Street in the vicinity of the stone retaining wall abutting
the Canal, replacing the chain link fence that exists today. The intent would be to improve vehicle safety while maintaining proper
pedestrian access. Presently, there is no protection, and vehicles veering off the retaining wall would land in a water hazard. On
October 11, 2009, a vehicle crashed into the fence and landed in the canal. This project would be similar to the safety
improvement made on the sidewalk and roadway at the Allds Street Bridge located near Spaulding Ave and would have a design

life of 20 years.

A-3. —_ FireDept _ All Facilities :
TPP a a ts” Deferred Maintenance’ 7-7 261,500 °° ~~. 264,500

Currently we are looking at several projects that have been put off due to funding priorities that continue to be
addressed. Although not any one of these projects will warrant our whole deferred maintenance budget, combined
they may. The Lake Street Station Logic System & Compressors for the HVAC system. Station 1 requires a
structural stability study of a 125 year old building that was not designed for today’s apparatus weights.
Replacement of the raided flooring in our dispatch center. Lake Street and East Hollis Street floor sealer protection
on the apparatus floors. Updating the Pine Hil! Road Station and replacing the roofs at Station 3 and 6.

18

Page Image
Board Of Aldermen - Agenda - 6/14/2016 - P32

Footer menu

  • Contact