Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 11/17/2021 - P109

Finance Committee - Agenda - 11/17/2021 - P109

By dnadmin on Mon, 11/07/2022 - 13:50
Document Date
Wed, 11/10/2021 - 18:08
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 11/17/2021 - 00:00
Page Number
109
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__111720…

Init.

MATA Document A133" - 2009

Standard Form of Agreement Between Owner a
as Constructor where the basis of payment is the Cost

Guaranteed Maximum Price

AGREEMENT made as of the Third day of May in the year 2021

(In words, indicate day, month and year.)

BETWEEN the Owner:
(Name, legal status and address)

City of Nashua New Hampshire
229 Main Street
Nashua, NH 03060

and the Construction Manager:
(Name, legal status and address)

Harvey Construction Corporation
10 Harvey Road
Bedford, NH 03110

for the following Project:
(Name and address or location)

Construction of a New D.P.W. Administration Office Bidg
840 W. Hollis Street
Nashua, NH 03062

The Architect:
(Name, legal status and address)

HKT Architects
24 Roland Street, Suite 30]
Charlestown, MA 02] 29

The Owner’s Designated Representative:
(Name, address and other information)

Lisa Fauteux, Director of Public Works

Nashua Public Works Administration & Engineering
9 Riverside StreetNashua, NH 03062

Telephone Number: 603-589-3140

Email Address: FauteuxL@nashuanh.goy

The Construction Manager’s Designated Representative:
(Name, address and other information)

AIA Document A133™ — 2009 (formerly A121 ™CMc - 2003). Copyright © 1994
The “American Inst tule of Architects,” “AIA,” the AIA Logo, and “AIA Contract Do:
This document was produced by AIA software at 11:15:33 ET on 05/04/2021 under Order
licensed for one-time use only, and may only be used in accordance with the AIA Contract

Copyright@aia.org.
User Notes:

nd Construction Manager
of the Work Plus a Fee with a

ADDITIONS AND DELETIONS:
The author of this document has
added information needed for its
completion. The author may also
have revised the text of the original
AIA standard form. An Additions and
Deletions Report that notes added
information as well as revisions to
the standard form text is available
from the author and should be
reviewed. A vertical line in the left
margin of this document indicates
where the author has added
necessary information and where
the author has added to or deleted
from the original AIA text.

This document has important legal
consequences. Consultation with an
attorney is encouraged with respect
to its completion or modification.

AIA Document A201 ™_2007,
General Conditions of the Contract
for Construction, is adopted in this
document by reference. Do not use
with other general conditions unless
this document is modified.

. 2003 and 2009 by The American Institute of Architects. All rights reserved.
ts” are registered trademarks and may not be used without permission

No.4797552925 which expires on 09/23/2021, is not for resale, is

Documents® Terms of Service. To report Copyright violations, e-mail

Page Image
Finance Committee - Agenda - 11/17/2021 - P109

Footer menu

  • Contact