Exhibit B - Scope of Services and Fee Summary for City of Nashua Parking Garage Study - Thornton-Tomasetti
Scope Estimated Proposed
Phase| Item # Description Purpose Assumptions Responsibility Deliverable | Labor (Hours} Cost
Project Engineer 8 Hours,
2F |Travel Travel Time for site assessment Associate 8 Hours, 20
Principal 4 Hours
i)
& Testing Expenses $1,300 (included in proposed cost),
$ Chain drag all cast-in- Chain drag all cast-in-place concrete toppings. (note work will . e PE $ ( ed }
ov 3A . . er Project Engineer 2 Hours, 4 $2,290
e place concrete toppings be completed during site visits as noted above). .
co Associate 2 Hours
6
<
oC
Ss
<
o
bo
& Submit
c Collect concrete samples for chloride ion testing at 6 . . testing
g 3B |Concrete Samples locations (3 per garage). Submit samples to laborator Project Engineer 1 report with 2
3 P . per garage). P y Associate 1 =P
om testing. Final Report
< wae
| Submission
ww
wv
E
Prepare opinion or probable costs and life cycle analysis for
twenty-year plan. The initial opinion will include the cost for
all the repairs noted during our site visits and the anticipated Project Engineer 12
future repairs. Life cycle analysis will include estimated Associate 4
design and construction administration fees, interest, and Principal 2
construction contingencies based on our previous
experience.
20-Year Plan, Life Cycle
Analysis
3 Updated 9/17/2020 - JS