CRANE AND HOIST »
CRANE BUILDERS, INSTALLERS AND TECHNICIANS
stated. Mass Crane built runway and bridge steel will be sandblasted prior to painting.
All paint for Gorbel type workstation cranes will be water-based paint unless otherwise stated
Epoxy and non-standard paint can be supplied for an additional cost.
Floor mounted disconnect and power to crane per NEC requirements by others
Mass Crane will provide its standard insurance certificate. If special requirements are needed, then Mass
Crane's insurance agent will review and advise.
Spare parts are not included unless otherwise stated.
1 Year parts and labor warranty included on factory defects
PE Stamp can be provided for a cost on a per job basis
If a training class is required as part of the scope our standard training class that has been created and
accepted by the state of MA will be the class that is presented. The training class, outline, handouts, quiz
etc. cannot be modified on a per job basis.
¢ (1) standard factory O&M manuals will be provided. If more than (1) copies are required or if additional
information is required, it may be an additional cost.
¢ Load testing not included unless otherwise stated in the main body of the quote
¢ If Mass Crane and Hoist is installing the runway system it will be leveled and braced per CMAA
specifications.
¢ If the runway structure is existing or being provided by others it is assumed the runway is/will be installed,
leveled, braced, and aligned per CMAA. It will be an additional cost if the runway is not installed per
CMAA specifications.
¢ Customer is responsible for the ability of the building to support the load imposed upon it by the
installation of the hoisting equipment. Mass Crane can provide a runway analysis for an additional cost.
¢ Shipment and storage: Unless otherwise noted equipment is rated for indoor use. Exposure to outdoor
elements can and will cause damage to the equipment, electrical components, paint surfaces, and void
the warranty.
# Mass Crane has not carried additional costs to store the equipment if the site is not ready. If the site is
not ready when the equipment is requested and previously scheduled it will be an additional cost to store
the equipment.
¢ Installation based on our non-union and non-prevailing wage rate crew during normal working hours
Monday-Friday 7:00-3:30 unless stated otherwise.
@ Foundations not included, if foundations are required it will be an additional cost.
Pricing based on one mobilization, if more than one mobilization is required it may be an additional cost.
¢ If special on-site training is required for installers and technicians prior to working on site, it will be billed
on T&M basis.
e*¢ ¢ ¢
e*¢¢ ¢
o/[Wjre watch (if required) will be by Mass Crane installation crew. If an outside fire watch is required, it will
be an additional cost unless otherwise stated.
‘As stated in the Invitation for Bids, issued December 8, 2020, the Successful Bidder shall furnish Performance and Payment Bonds,
each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all obligations under
the Contract Documents. These Bonds shall remain in effect at least until one year after the date when final payment becomes due,
except as provided otherwise by Laws or Regulations or by the Contract Documents. Successful Bidder shall also furnish such other
Bonds as are required by the Contract Documents. When Successful Bidder delivers the executed agreements to the City, Successful
Bidder shall also deliver to the City such Bonds as may be required to furnish.
Cost of bond premiums to be incorporated into the bid item costs.
§00-1 Potash Hill Road, Tyngsboro, MA 01879 e TELEPHONE 800-909-2299 « www.masscrane.com a