Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/17/2021 - P72

Finance Committee - Agenda - 2/17/2021 - P72

By dnadmin on Mon, 11/07/2022 - 13:47
Document Date
Fri, 02/12/2021 - 11:32
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/17/2021 - 00:00
Page Number
72
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021720…

Standard Operating Procedure for:

A.1 IDDE: Inspections During Mapping

Purpose of SOP:

inspections during mapping.

This SOP provides a basic checklist for managers and field crews conducting illicit discharge

Always:

@ Characterize the outfall by recording information on the Storm

Drain Characteristic Form.

4 Conduct inspections during dry weather periods using the Dry

Weather Outfall Inspection Form.

4 Follow procedure below if an illicit discharge is encountered

(such as raw sewage, paint, etc...
4 Conduct inspections with at least two staff per crew.
@ Carry a list of emergency phone numbers.

Whenever Possible:

¢@ Conduct inspections during low groundwater and leaf off

conditions.

@ Photograph the outfall with a digital camera (use dry erase or

chalk board to identify outfall).
4 = Identify and label the outfall with a unique identifier. For
example “SWO-013".

4 If dry weather flow is present at the outfall, and the flow does
not appear to be an illicit discharge attempt to identify the
source of the flow (intermittent stream etc.), then document the

discharge for future comparison.
Carry an authorization letter.

Ld

4 Collect samples of flowing discharges before and after source

removal. (Contact NHDES for technical assistance.)

Never:
@ Never put yourself in danger.
@ Never enter private property without permission

Dry Weather Discharge

The CWP defines dry
weather as a 48 hour period
with no runoff-producing
rainfall. NEIWPCC defines
dry weather as a 48-72 hour
period with less than 1/10-
inch rainfall.

Equipment list for mapping:

Existing paper maps

Field sheels

Camera (preferably digital) on
pole

GPS Unit

Spray paint (or other marker)
Cell phones or

hand-held radios

Clip boards and pencils
First aid kit

Flash light or head lamp

10. Surgical gloves

11. Tape measure

12. Temperature probe

13. Waders

14. Watch with a second hand
15. Five 1-liter sample bottles.
16. Dry erase board (for photos)
17. Hand sanitizer

18. Sampling pole

19, Mirror (for light)

20. Safety vests

Corny DAP WN

Procedures to follow if illicit discharge is detected:
a Call dispatch / supervisor.

Use the Dry Weather Outfall Inspection Form to document observations.

Take photos.

Qo
a Visually inspect general area for possible sources.
Oo
a Estimate fiow/collect samples if instructed to do so.

37

Hic it Discharge Detection and Eimination Plan

37

Page Image
Finance Committee - Agenda - 2/17/2021 - P72

Footer menu

  • Contact