SECTION 01320
SURVEY CONTROL
PART 1 - GENERAL
1.1 SURVEY REFERENCE POINTS
A.
OWNER has established survey control points around the Site for construction
horizontal and vertical control. OWNER shall provide survey control point
information to the CONTRACTOR once the contact is awarded.
CONTRACTOR shall safeguard all survey control points. Should any of these
points be destroyed, then the replacement cost will be borne by CONTRACTOR.
CONTRACTOR shall assume the entire expense of rectifying work improperly
constructed due to failure to maintain and protect established survey control
points.
12 QUALIFICATIONS
A.
CONTRACTOR shall employ competent personnel to provide the surveying
functions necessary for the proper construction of the Work. CONTRACTOR
shall be responsible for the layout of all grid coordinate locations, lines, grades,
and levels necessary for the proper construction and testing of the Work called
for in the Drawings and Specifications, at no additional cost to OWNER.
13 SURVEY REQUIREMENTS
A.
CONTRACTOR shall make all measurements and check all dimensions
necessary for proper construction in accordance with the Drawings and
Specifications. During the execution of the Work, CONTRACTOR shall make all
necessary measurements to prevent misalignment of said Work, and shall be
responsible therefore for the accurate construction of the Project.
CONTRACTOR shall be responsible for providing a surveyor to measure
quantities for payment. Prior to submitting an application for payment,
OWNER’s field representative shall approve measured quantities for payment.
OWNER reserves the right to employ a surveyor to check CONTRACTOR’s
measurements prior to payment.
CONTRACTOR and/or CONTRACTOR’s surveyor shall keep and update Record
Drawings throughout the project, which shall be available to view by OWNER
and ENGINEER.
PART 2 - PRODUCTS
Not used.