ITEM 632.80 - TEMPORARY PAVEMENT MARKERS
A. SCOPE
This work shall consist of furnishing, placing, and removing temporary pavement markers
(TPMs) at locations shown on the plans or as ordered by the Engineer in accordance with the
latest approved NHDOT Standard Specifications for Road and Bridge Construction, and the
latest approved MUTCD.
B. MATERIALS AND CONSTRUCTION
The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement and removal of TPMs in accordance with the latest approved NHDOT
Standard Specifications for Road and Bridge Construction, and the latest approved MUTCD.
Channelizing Lines: TPMs used in channelizing line applications shall have white one-way retro
reflectors facing traffic.
Lane Lines: TPMs used in lane line applications shall have white one-way or white/red two-way
retro reflectors as specified, with white facing traffic.
Edge Lines: TPMs used in edge line applications shall have one-way reflectors facing traffic, and
which match the existing edge line color.
Center Lines: TPMs used in center line applications shall have yellow two-way reflectors.
C. MEASUREMENT AND PAYMENT
The quantity of Temporary Pavement Markers to be paid for will be the actual number of
temporary pavement markers which have been satisfactorily installed and accepted by the
Engineer, and will be paid for at the contract unit price specified for each. Replacement of
temporary pavement markers that are damaged or removed shall be incidental to original
installation.
Contractor shall record the number of temporary markers installed. Quantities shall be recorded
on a per street basis. Payment is contingent upon submittal of quantities in a per street format.
Page 40 of 43
