ITEM 609.5 -RESET GRANITE CURB
A. SCOPE
This work shall consist of removal, stockpiling and resetting granite curb as shown on the
drawings or as directed by the Engineer. Furnishing and placing all materials required for
resetting granite curb shall be included.
B. MATERIALS AND CONSTRUCTION
The Contractor shall furnish all materials, labor and equipment necessary for resetting granite
curb in accordance with relevant provisions of Section 609 of the NHDOT Standard
Specifications for Road and Bridge Construction, latest edition, and City of Nashua Standard
Specifications for Sidewalk Construction, latest edition. The most stringent specifications shall
apply unless otherwise directed by the Engineer.
Granite curb shall be set with concrete. Concrete shall extend from the top of the binder course
of pavement to below the bottom of the granite curb.
C. MEASUREMENT AND PAYMENT
Reset Granite Curb will be measured by the linear foot to the nearest 0.1 foot, from end to end
along the lower edge of the exposed face of the curbing. Payment for this item shall be at the
contract unit price per linear foot, complete in place, and shall include all materials, labor,
equipment, and all else needed to complete the work under this item.
Contractor shall record the location and linear feet of granite curb reset for each street. Payment
is contingent upon submittal of quantities in a per street format.
Page 27 of 43