ITEM 603.82212 — 12” POLYETHYLENE PIPE (TYPE S)
A.
SCOPE
This work shall consist of furnishing and installing polyethylene (PE) pipe type S, at the
locations shown on the plans or as ordered by the Engineer.
MATERIALS AND CONSTRUCTION
The Contractor shall furnish all materials, including the necessary joints, fittings, and
connections as required, labor and equipment necessary for the excavation, placement,
and joining of pipe in accordance with relevant provisions of Section 603 of the NHDOT
Standard Specifications for Road and Bridge Construction, latest edition. Sawed
pavement, common structure excavation to the depth specified in of Section 206.4.1 of
the NHDOT Standard Specifications for Road and Bridge Construction latest edition,
secondary excavation required in the imperfect trench method, bedding, shaping of
bedding, and backfill shall be included in this work.
MEASUREMENT AND PAYMENT
Pipe will be measured by the linear foot to the nearest foot. Measurement of circular pipe
will be made between the ends of the pipe along the central axis, including through
elbows and bends, as installed. No separate measurement will be made for elbows or
bends. Connection of the pipe to an existing drainage structure as directed by the
Engineer is incidental.
Page 14 of 43