Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/17/2021 - P404

Finance Committee - Agenda - 3/17/2021 - P404

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
404
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

17.

18.

19.

20.

If the CONTRACTOR should fail to promptly remove debris or surplus material from
the project area, or if CONTRACTOR deposits same on private property, progress
payment(s) may be withheld.

DISPOSAL OF SURPLUS EXCAVATED MATERIAL

All milled (cold planed) pavement shall be delivered to the Four Hills Landfill in
Nashua, NH. Unless otherwise specified herein, all other excess material not required for
use on the project shall be disposed of legally and safely by the CONTRACTOR at his
discretion outside of and away from the limits of the project, without additional
compensation.

MAINTENANCE DURING WEATHER EVENTS
The CONTRACTOR’ s obligation to protect the public traveling through the project site

shall include maintaining the work and maintaining safe passage during rain and other
weather events.

The CONTRACTOR shall plan in advance of forecasted inclement weather events and
shall assign crews to perform maintenance of unpaved areas open to traffic during and
after inclement weather events. CONTRACTOR is responsible to coordinate with the
ENGINEER and other City officials as appropriate.

CONTRACTOR shall be prepared to respond in a timely manner if the City determines
that circumstances warrant action when the CONTRACTOR is not onsite.

DRAINAGE
The CONTRACTOR shall provide necessary measures to provide drainage and minimize
ponding on paved and unpaved surfaces.

The CONTRACTOR shall be responsible to provide means for stormwater runoff to
enter the drainage system at locations where structures are lowered in advance of milling
or reclamation.

During the preconstruction meeting, the CONTRACTOR shall describe provisions to be
made for drainage. Provisions made and methods used shall have been proven by
successful use on past projects of a similar nature.

PROTECTI FMANHOLE ATCH BASINS AND PIPELINE

Appropriate measures will be taken to protect manholes, catch basins and other structures
as well as pipelines from debris and other materials entering the system through open or
removed covers or grates.

Should material enter the system during the CONTRACTOR’s activities, this material
shall be removed in a timely manner at the CONTRACTOR’s expense.

The CONTRACTOR may be required to clean structures and pipelines downstream of
the location(s) where material entered the system.

The CONTRACTOR may be required to provide closed circuit television (CCTV)
inspection services to verify that material has been removed at the CONTRACTOR’s
expense.

SC - 7 of 9