  2. Finance Committee - Agenda - 3/17/2021 - P400

Finance Committee - Agenda - 3/17/2021 - P400

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
400
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

TIE-IN AT SIDE ROAD
Where roadways are being milled to a depth of 3.5 inches, side road tie-in areas will be
milled to a depth of 2.0 inches.

INTERIM MILESTONES FOR SUBSTANTIAL MPLETI
The following Substantial Completion Milestones shall be met:

All roads, except those with delayed start dates (see Paragraph 4 - Other Work in
Contract Area), shall be binder paved by July 1“, 2021.

The entire length of all roadway segments shall be substantially complete by October 15,
2021.

COMPLETION OF WORK ON INDIVIDUAL STREETS
Streets specified as 2” mill and overlay shall have all ADA ramp work completed and be
final paved within three weeks of milling.

Streets specified as 3.5” mill and overlay or reclaim shall be binder paved within three
weeks of milling or reclamation. All ADA ramp work shall be completed within three
weeks after placement of binder pavement.

Streets shall be final paved within two weeks after structures have been raised to their final
elevation, and ADA ramp work has been completed.

Failure to pave individual streets within the specified time frames without reasonable
cause shall be considered nonperformance.

The ENGINEER may remove streets from the scope of the Contract should repeated
instances of nonperformance occur.

The determination of whether or not delay in paving individual streets occurred with
reasonable cause will be at the ENGINEER’s discretion.

WORK HOURS

Reference is made to Section 6.02 Labor; Working Hours of the General Conditions.

Normal working hours shall be from 7:00 AM to 5:00 PM Monday through Friday. No
weekend, holiday or night work will be allowed without advance written approval of the
City ENGINEER.

Permission is granted to extend the work hours to 7:00 AM to 5:00 PM for the following
streets listed in General Condition Section 6.02C.

East Hollis Street
East Dunstable Street
Main Street

Pine Hill Road

West Hollis Street

SC - 3 of 9