  2. Finance Committee - Agenda - 3/17/2021 - P372

Finance Committee - Agenda - 3/17/2021 - P372

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
372
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

E. ENGINEER’s Review
1. ENGINEER will timely review and approve Shop Drawings and Samples in accordance with the schedule of Shop
Drawings and Sample submittals acceptable to ENGINEER. ENGINEER’s review and approval will be only to
determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to
the information given in the Contract Documents and be compatible with the design concept of the completed
Project as a functioning whole as indicated by the Contract Documents.

2.ENGINEER’s review and approval will not extend to means, methods, techniques, sequences, or procedures of
construction (except where a particular means, method, technique, sequence, or procedure of construction is
specifically and expressly called for the Contract Documents) or to safety precautions or programs incident
thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the
item functions.

3. ENGINEER’s review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility
for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called
ENGINEER’s attention to each such variation at the time of each submittal as required by paragraph 6.17.D.3 and
ENGINEER has given written approval of each such variation by specific written notation thereof incorporated in or
accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CONTRACTOR
from responsibility for complying with the requirements of paragraph 6.17.D.1.

F. Resubmittal Procedures
1. CONTRACTOR shall make corrections required by ENGINEER and shall return the required number of corrected
copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct
specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals.
6.18 Continuing the Work
A. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements
with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as
permitted by paragraph 15.04 or as OWNER and CONTRACTOR may otherwise agree in writing.
6.19 CONTRACTOR’s General Warranty and Guarantee
A. CONTRACTOR warrants and guarantees to OWNER, ENGINEER, and ENGINEER’s Consultants that all Work will be in
accordance with the Contract Documents and will not be defective. CONTRACTOR’s warranty and guarantee

hereunder excludes defects or damage caused by:

1. Abuse, modification, or improper maintenance or operation by persons other than CONTRACTOR,
Subcontractors, Suppliers, or any other individual or entity for wnom CONTRACTOR is responsible; or

2. Normal wear and tear under normal usage.
B. CONTRACTOR’s obligation to perform and complete the Work in accordance with the Contract Documents shall be
absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract
Documents or a release of CONTRACTOR’s obligation to perform the Work in accordance with the Contract
Documents:

1. Observations by ENGINEER;

2. Recommendation by ENGINEER or payment by OWNER OF ANY PROGRESS OR FINAL PAYMENT;

GC - 31 0f 55

Page Image
Finance Committee - Agenda - 3/17/2021 - P372