Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/17/2021 - P152

Finance Committee - Agenda - 3/17/2021 - P152

By dnadmin on Mon, 11/07/2022 - 13:44
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
152
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

42. Subcontractor--An individual or entity having a direct contract with CONTRACTOR or with any other
Subcontractor for the performance of a part of the Work at the Site.

43. Substantial Completion--The time at which the Work (or a specified part thereof) has progressed to the point
where, in the opinion of ENGINEER, the Work (or a specified part thereof) is sufficiently complete, in accordance
with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for
which it is intended. The terms “substantially complete” and “substantially completed” as applied to all or part of
the Work refer to Substantial Completion thereof.

44. Supplementary Conditions--That part of the Contract Documents which amends or supplements these
General Conditions.

45. Supplier--A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract
with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by
CONTRACTOR or any Subcontractor.

46. Underground Facilities--All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks,
tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those
that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable
television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

47. Unit Price Work--Work to be paid for on the basis of unit prices.

48. Work--The entire completed construction or the various separately identifiable parts thereof required to be
provided in the Contract Documents. Work includes and is the result of performing or providing all labor, services,
and documentation necessary to produce such construction, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract Documents.

49. Written Amendment--A written statement modifying the Contract Documents, signed by OWNER and
CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the nonENGINEERing or
nontechnical rather than strictly construction-related aspects of the Contract Documents.

1.02 Terminology

A. Intent of Certain Terms or Adjectives

Dod

1. Whenever in the Contract Documents the terms “as allows,” “as approved,” or terms of like effect or import are
used, or the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of like effect
or import are used to describe an action or determination of ENGINEER as to the Work, it is intended that such
action or determination will be solely to evaluate, in general, the completed Work for compliance with the
requirements of and information in the Contract Documents and conformance with the design concept of the
completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a
specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to
ENGINEER any duty or authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility contrary to the provisions of paragraph 9.10 or any other provision of the Contract
Documents.

Dod

B. Day

1. The work “day” shall constitute a calendar day of regular working hours except Saturdays, Sundays and any legal
holiday.