Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/2/2021 - P16

Finance Committee - Agenda - 6/2/2021 - P16

By dnadmin on Mon, 11/07/2022 - 13:39
Document Date
Thu, 05/27/2021 - 15:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/02/2021 - 00:00
Page Number
16
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060220…

PART 1

1.01

1.02

1.03

EPDM Adhered
Roofing Spec

GENERAL

DESCRIPTION

A.

The project consists of installing Carlisle’s Sure-Seal EPDM Adhered Roofing System as outlined below:

(choose the appropriate paragraph and delete remainder)

Apply the Adhered EPDM Roofing System in conjunction with R-20 Iso Insulation over existing metal roof
deck.

EXTENT OF WORK

A.

Provide all labor, material, tools, equipment, and supervision necessary to complete the installation of a Sure-
Seal 60-mil EPDM membrane Fully Adhered Roofing System including flashings and insulation as specified
herein and as indicated on the drawings in accordance with the manufacturer’s most current specifications
and details.

The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall
make themselves aware of all job site conditions that will affect their work.

The roofing contractor shall confirm all given information and advise the building owner, prior to bid, of any
conflicts that will affect their cost proposal.

Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer
must submit for pre-qualification in writing fourteen (14) days prior to the bid date. Any contractor who fails
to submit all information as requested will be subject to rejection. Bids stating “as per plans and specs” will
be unacceptable.

SUBMITTALS

A.

Prior to starting work, the roofing contractor must submit the following:
1. Shop drawings showing layout, details of construction and identification of materials.

2. Sample of the manufacturer’s Total Systems Warranty covering all components of the roofing
system.

3. Submit a letter of certification from the manufacturer which certifies the roofing contractor is
authorized to install the manufacturer’s roofing system and lists foremen who have received training
from the manufacturer along with the dates training was received.

4, Certification of the manufacturer’s warranty reserve.

Upon completion of the installed work, submit copies of the manufacturer’s final inspection report to the
specifier prior to the issuance of the manufacturer’s warranty.

1

Page Image
Finance Committee - Agenda - 6/2/2021 - P16

Footer menu

  • Contact