ALTERNATE BID ITEMS (IF AWARDED BY OWNER)
ALTERNATE A-1 LUMP SUM PRICE: Difference in price to furnish and install
complete Gorman-Rupp Wastewater Submersible Pumps (Owner's Preference) as
shown on the Drawings
O Add © Deduct
Wincluded In Base Bid (If checked, indicate $0)
Le Te) Dollars and
Zz 2 C QD Cents
(Use words)
, 0.00
{Use figures)
ALTERNATE A-2 LUMP SUM PRICE: Difference in price to furnish and install complete
Gorman-Rupp Wastewater Suction Lift Pumps (Owner's Preference) as shown on
the Drawings
Add (1 Deduct
RR Included in Base Bid (if checked, indicate $0)
Zz £0 Dollars and
ZL O Cents $ O,0 O
(Use words} (Use figures)
TOTAL ALTERNATE A LUMP SUM PRICE (Items A-1 and A-2)
7 €D_ Dollars and
LE [QO Cents $ © ? oO
(Use words) (Use figures)
ALTERNATE 8 LUMP SUM PRICE: Difference in price to furnish and install complete
Allen-Bradley Programmable Logic Controllers (Owner's Preference) as shown on
the Drawings
( Add (] Deduct
MAL included in Base Bid (If checked, indicate $0)
Ze TO Dollars and
7-20 O Cents § O 1, OO
(Use words) (Use figures}