Denis, B.M., Pinnette, J.R.
Tobiason, D.F., McNeil, F,
and Robertson, R.
“Manchester, New
Hampshire, Retools Its
Aeration System for the Next
Generation” NEWEA Journal,
Summer 2017
Pinnette, J.R., “Odor Control
for Wastewater Utilities,”
MWIUA Annual Trade Show,
Portland, Maine, February 8,
2017
Pinnette, J.R., “Value
Engineering: What Projects
Need It, Why It’s Important,
When to Start the Process,
and How to Do It,” MeWEA
Spring Conference, Bangor,
Maine, April 15, 2016
Capano, D.E. and JR.
Pinnette, “Odor Control Case
Study: Evaluation and
Corrective Action at the
Stamford WPCF” NEWEA
Annual Conference, Boston,
January 27, 2016
Pinnette, J.R., and Cockburn,
D.L., “Planning for Climate
Change at Your Wastewater
Treatment Facility: What You
Should Be Doing Now,”
NEWEA Annual Conference,
Boston, Massachusetts
January 27, 2015
Peckenham, J.M., Pinnette,
J.R., and MacDonald, G., "The
Biosolids White Paper -
Making Objective Science
Accessible", International
Water Association Specialist
Conference on Biosolids,
Moncton, New Brunswick,
June 25, 2007
WRIGHT-PIERCE >
Engineering a Better Environment
Je fire y Pinne tte, PE
He adworks Screening Upgrade, Nashua, NH
Oversaw design and construction of new influent screens for the 50-MGD main
pump station including new automation for the raw influent pumps to minimize the
potential for flooding of the lower screening area and wetwells.
Maiden Lady Cove Pump Station Force Main Evaluation, Winnipesaukee River
Basin Program, Franklin, NH
Oversaw evaluation and remediation of a section of force main that had been
undermined due to soil loss in the bedding at an old stone culvert.
Pump Stations Re placement and SCADA/ Telemetry Upgrade, Manchester NH
Oversaw design and construction of replacement pump stations for the Juniper and
Trolley Crossing service areas. In addition, the project included a new pump station,
SCADA, and telemetry for all the municipal wastewater pump stations in the city. The
project also included an upgrade of the screening and control systems at the 26-
MGD West Side Pump Station.
City-Wide Pump Station Evaluation, Manchester, NH
Oversaw an evaluation of the nine municipal wastewater pump stations in the city's
collection system.
Tenney Mountain Pump Station #4, Forre Main Evaluation, and Phase 1 and 2
Upgrades, Plymouth, NH
Oversaw the evaluation and emergency Phase 1 replacement of a section of force
main that had failed seven times in 18 months. Oversaw Phase 2 of the force main
replacement project as well.
WPCF Main Pump Station Upgrade and OdorContol Assistance, Stamford, CT
Technical advisor for design of screening, pumping, and odor control improvements
to the main pump station for the Stamford WPCF. Also, conducted an evaluation of
four existing scrubber systems focusing on mist carry over and leading to fan speed
adjustments and new recirculation pumps.
WWTP Upgrade, Mattabasse tt District, Cromwell, CT
Technical advisor for odor control and main pump station improvements as part of
major upgrade of WWTF at this space limited site. The 80-MGD influent pump
station was upgraded with new screening facilities and a new 4,800-cfm activated
carbon system for odor control.
India Street Pump Station, Portland, ME
Managed evaluation of the 37-MGD India Street pump station as part of planning for
eastern waterfront redevelopment.
Crescent Road Pump Station, Manchester NH
Responsible for evaluation, design, and construction of $1.2 million screening system
upgrade for the Crescent Road Pump Station, which is the main pump station of the
wastewater treatment facility. The project included three new climber screens with
80-MGD peak flow capacity, three new wash presses, and a variety of additional
improvements.
