Document Date
Meeting Description
Document Type
Meeting Date
Page Number
127
REFERENCES
(SCHEDULE A)
(5) Project: Winchester Soccer Club
Project Description:
The project consists of indoor and outdoor synthetic turf fields, natural grass field, parking, monumentations, future
playground and general site improvements. The project was completed September 1, 2021. Challenges included close
proximity to the Aberjona River, modifications to the FEMA Regulated Floodway, wetland permitting, and contaminated
soils.
Reference Name and Title: Ben Paul, President, Winchester Soccer Club
617-821-7281 bpaul@securerecord.com
Phone: Email:
RFPO651-091421 Conceptual Field Study for Mine Falls Park Athletic Area Page 14 of 6
Page Image
