Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/6/2021 - P125

Finance Committee - Agenda - 10/6/2021 - P125

By dnadmin on Mon, 11/07/2022 - 13:37
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
125
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

REFERENCES
(SCHEDULE A)

; Leary and Yetten Fields Study
(1) Project:

Project Description:
Project consisted of a Feasibility Study and Schematic Design for a synthetic turf multipurpose field,
AOO meter running track and a synthetic turf baseball stadium. Additional considerations included a
filed house with storage, concessions and locker rooms, grandstands with press box and lift, site
amenities, ADA walkways and ramps, and general site improvements. Challenges included
unsittable soils, and floodplain.

. John Pinzone, Director of Facilities, Waltham Public Schools
Reference Name and Title:

Phone: (781) 314-5420 Email: (782) 314-5420

(2) Project: Taunton High School Master Plan/Study

Project Description:

Project included multi phased feasibility studies. Phase |— Tennis Courts, Phase Il — Baseball Stadium,
Phase Ill — 400 Meter Track and Synthetic Turf Field, Phase IV — Synthetic Turf Softball Fields with
shared Multipurpose Outfield, Phase V— Synthetic Turf Multipurpose Field. To date, phases | and Il
have been constructed. Currently Nesra is Designing Phase Ill with phase IV being slated for 2022.
Challenges included close proximity to the Taunton River, Protected Species, wetlands, and

floodplain.

. John Cabral — Superintendent of Schools

Reference Name and Title:
JCabral@TauntonSchools.org

508-821-1177 Email:

Phone:

RFPO651-091421 Conceptual Field Study for Mine Falls Park Athletic Area Page | 2 of 6

Page Image
Finance Committee - Agenda - 10/6/2021 - P125

Footer menu

  • Contact