Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/6/2021 - P122

Finance Committee - Agenda - 10/6/2021 - P122

By dnadmin on Mon, 11/07/2022 - 13:37
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
122
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

THIS FORM MUST BESUBMITTED WITH ALL RESPONSES TO RFP
PROPOSAL PRICING

INSTRUCTIONS FOR “PROPOSAL COSTS” SUBMITTALS:

Provide Lump Pricing for each Task below

TASK 1 - EXISTING CONDITIONS LUMP SUM PRICE $ |5;-000- 00

© TASK 1.1: Work with City to download applicable GIS information and develop a base map for the
site - no new survey work is included at this time. The final base plan should include available
resource area information and required setbacks;

* TASK 1.2: Review existing information from the City on existing conditions (e.g. old geotechnical
reports, old construction documents, etc.); and

* TASK 1,3: Geotechnical Explorations: 2 days of geoprobes across site (approximately 18 probes)
with report on findings and general recommendations/challenges for the project elements.

TASK 2 — CONCEPTUAL OPTION DEVELOPMENT LUMP SUM PRICE g 5,000. 00

* TASK 2.1: Meeting #1: Kick-off / Programming meeting with City; provide meeting notes to entire
Project team;

* TASK 2.2: Develop three (3) layout and general grading options for site as well as consideration of
construction access to the site; provide a summary of benefits and challenges for each option (should
include permitting and construction considerations); and

¢ TASK 2.3: Meeting #2: Meet with City to review and discuss options and potential project phasing
(example, lights at a later time, one field first, add another later, etc.).

TASK 3 - PREFERRED OPTION LUMP SUM PRICE B 3, S00. 00

ASK 3.1: Develop preferred option based on meeting discussion;

TASK 3.2: Develop cost estimate of preferred option and consider project phasing based on meeting
discussion;

TASK 3.3: Meeting #3: Meet with the City to review Preferred Option, Estimate, and Phasing; provide
meeting notes to entire Project team; and

TASK 3.4: Refine Option, Estimate, and Phasing as needed.

TASK 4 -PROJECT MEMORANDUM LUMP SUM PRICE f£ a, 400.00

* TASK 4,1: Provide a 2D rendering of the proposed project; and
* TASK 4,2: Provide a Project Study Graphic Memorandum outlining process, findings, and results;
deliver electronically to the City

TOTAL PROPOSAL PRICE g a5, 900.00

RFP0651-091421 Conceptual Field Study for Mine Falls Park Athletic Area Pagel lof 2