walls, concessions and restrooms building, streetscape improvements, athletic and
pedestrian lighting, formalized entrances, hardscape surface, elevated planting beds,
monuments, irrigation system scoreboards, and much more.
¢ 9-11 Memorial Park, Everett, MA — Project consisted of two small adjacent parks. Challenges
included providing ADA connectivity between both parks, while maintaining the unique
features of each. Improvements include pedestrian walkways, site furnishings, picnic area,
holiday tree, community gathering area, water feature, up lighting and irrigation.
e Playground and Athletic Field, Madeline English School, Everett, MA — Project included a
playground, synthetic turf multipurpose athletic field, landscaping improvements, ADA
compliant walkways and athletic field lighting. Provided monitoring and oversight for the
removal of contaminated soils and proper capping of the site.
¢ Brook Charter School Playground Renovation Project, Roslindale, MA — Project consisted of a
small playground and synthetic turf play area.
¢ Taunton High School, Taunton, MA — Phase | of the project included eight tennis courts with
perimeter fencing, drainage improvements and ADA accessibility. Phase || included a
synthetic turf baseball field, ADA accessibility, solar scoreboard, backstops, batting tunnels,
bullpens and infrastructure for future lights and grandstands.
e Shawsheen Valley Regional Technical High School, Billerica, MA — Project consisted of a
natural turf softball field with backstop, prefabricated dugouts, perimeter fencing, irrigation,
grandstands, bullpens and batting tunnels.
e Winchester Soccer Club Athletic Complex, Winchester, MA —Project consisted of an indoor
synthetic turf field, outdoor synthetic turf field, a natural grass field, parking lots, and site
improvements. The indoor facility boasts a 70,000 square foot athletic field, elevated fitness
area, offices, locker rooms, concessions and restrooms; The outdoor facilities include
lighting, scoreboards, ADA and emergency access and other site amenities.
e Bike Path Improvements Project, Everett, MA — Project includes new pedestrian lighting,
emergency call boxes, cameras, and general site improvements. The project is currently in
construction.
¢ Memorial Stadium, Everett, MA — Project consisted of an in-filled synthetic turf
multipurpose field, sand based volleyball court, track and field events such as long jump and
triple jump, perimeter jogging track, grandstands and athletic field lighting.
e Athletic Field Renovation Project, Burlington, MA — Project consisted of a natural turf
athletic field at Burlington High School. Improvements include a stone drainage layer under
the root zone, amended root zone for the sod and irrigation. Future phases included bike
path with lighting, new vestibule and elevator for the high school, site improvements, ADA
accessibility from the building to the athletic fields.