Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/6/2021 - P59

Finance Committee - Agenda - 10/6/2021 - P59

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
59
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

i - je NE. SR A (508) 221-7174

WWW.NESRAENG.COM

~~ ENGINEERING, LLC

Depending on the project, Nesra can also incorporate facilities designed to provide additional sources of
revenue for our clients. Nesra sets itself apart from the competition by the way we strive, on every project,
to create a unique focal point derived through community outreach, input from local officials, natural site
conditions and other factors which are critical in the design process.

An example of this is the community outreach process that Nesra advocated for to incorporate the Bike to
the Sea project in Everett. Nesra was at the forefront of this project which originally began at Sacramone
Park. Even though this bike path was not yet built, our team accounted for the path and the surrounding
Parks to ensure the trail seamlessly flowed through the various neighborhoods, parks, and athletic facilities
once it eventually connects to the adjacent town. Nesra also assisted the City of Nashua with the
grant writing process to help secure funds that were instrumental to finish the trail.

Below is a brief list of our most recent projects (2019 to 2021) where Nesra fully designed, permitted, and
provided construction administration on the following projects:

Sacramone Park, Everett, MA: Project involved Research, Survey, Community Outreach, Soil Testing,
Environmental Remediation, Schematic Design, 100% Design and Construction Documents, Construction
Estimates, Bid Specifications, Bid Assistance, Construction Administration, Project Closeout and Follow up.
(City funded; Cost 3.5M)

@ Winchester Community Park Sports Complex: This project is a 10.5 Million dollar indoor and outdoor
facility consisting of two outdoor soccer fields and one indoor 90,000 SF athletic stadium with
overhanging mezzanines, cross fit exercise areas, locker rooms, showers, administrative offices, kitchen,
dining area, and restrooms. The facility was constructed with a state-of-the-art drainage system
specifically designed to handle flooding by incorporating a series of drainage chambers within the
foundation. (Private Funded; Cost 10.5M+)

e@ Bentley University Football, Field Hockey, Lacrosse, and Softball Facilities, Waltham, MA: Nesra had the
honor of providing Bentley University with master planning and design services to upgrade their existing
football, field hockey, and lacrosse fields. The second phase of this project involves upgrading the
woman’s softball field. Nesra has provided Site Assessment, 100% Design, Permitting, Infiltration Testing,
Planarity Testing, Construction Administration and Layout. The Softball Field construction is currently on
hold due to COVI-19. (Private Funded; Cost 2.5M+)

e 175 Post Road Garages & Office Building: Nesra is currently working with the owner of this multi-million
dollar project to provide up to 8 upscale garage buildings, 1 multi-level office building, and expansive
parking lot. Nesra assisted with peer review services, high level permitting research, and 3D concept
modeling of the proposed facilities. (Private Funded; Cost 20M+)

® Swan Street Park — Phases | and Il, Everett, MA: Project involved Research, Survey, Community Outreach,
Schematic Design, Major Utility Relocation, 100% Design and Construction Documents & Estimates, Bid
Specifications, Bid Assistance, Construction Administration, Daily Inspection Reports, Project Closeout and
Follow up. (CPA funding; Cost 3M)

Page Image
Finance Committee - Agenda - 10/6/2021 - P59

Footer menu

  • Contact