Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/6/2021 - P31

Finance Committee - Agenda - 10/6/2021 - P31

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
31
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

MANU CE CUU NYY

CE Cee eC ae

31 Will Street -— PO BOX 3554 —- NASHUA, N.H. 03060
PH (603)886-0200 / FAX 886-0025 / EMAIL — www.gatecityelectric.com

DATE:

PROPOSAL

8/23/21

PROJECT: Lighting Upgrade - IT Tech Area

City Hall — third floor

SUBMIT TO: City of Nashua

229 Main Street
Nashua, New Hampshire 03060
Attn: Nick Miseirvitch

TEL. 603-759-6926
MiseirvitchN@nashuanh.qov

Gate City will provide the following electrical lighting task as described below :

1.

N@

9.

Disconnect and remove, to City Provided dumpster on site, all fluorescent light
fixtures located in IT Tech Area, small office along outside wall, Vault, and
Programming open office area

Gate City shall properly dispose of all fluorescent lamps through a recycling
company.

Install a total of twenty nine 2x2 LED flat panel lights after new ceiling grid is
installed. Light fixtures shall be 35 kelvin color temp to match newly renovated
spaces below. All fixtures shall be wired with new 12/2 MC cable and supported
from building structure with #12 jack chain or ceiling tie-wire.

install 3 new LED dimmer switches at left hand side of main entry door, one
dimmer shall control 3 lights along left hand wall, one dimmer shall control 4 light
just above entry door, and one dimmer shall control 6 lights in Tech Area.

install one ceiling mounted occupancy sensor to operate 6 lights above common
corridor area of Tech Area. lights shall be turned off and on automatically

install new dimmer switch in office to control two lights

install one ceiling mounted occupancy sensor in Vault Ceiling to operate two new
Aft surface LED lights and in Programming Area to control eight lights

install surface mounted Wiremold convenience outlet for TV at entry doorway
and one Wiremold box and raceway for Coax cabling by others

Eversource Lighting rebate savings are included in the project cost below

10. payment terms to be 30 days from invoice date

Total Project Cost $9,800.00

Guy Lavoie / Vice President

Page Image
Finance Committee - Agenda - 10/6/2021 - P31

Footer menu

  • Contact