EXHIBIT B
HL Turner Scope of Services
Jackson Mills Turbine/Generator/Controls Upgrade Project
Nashua, New Hampshire
The Jackson Mills Hydroplant Turbine/Generator/Controls Upgrade Project (”project”) is the
subject of Agreements between the City of Nashua and Bancroft Contracting Corporation
and the City of Nashua and Mavel Americas. Project work is described in that Agreement
along with a general description of the Engineer’s role representing the City of Nashua.
This scope references and includes the responsibilities for the “Engineer” as identified in the
Nashua/Bancroft Agreement (Article 9 — Engineer’s Status during Construction) and other
references to the Engineer’s duties representing the City as identified throughout the
City/Bancroft and City/Mavel Agreements.
SCOPE OF SERVICES
A. General Overview of Services
The H.L. Turner Group Inc. (The Turner Group or “we”) also known as the Engineer
of Record (EOR} and “Engineer” in project documents shall: acauire data; perform
research; perform site surveys and investigations; perform hydraulic, structural,
mechanical, electrical, civil, and architectural analyses and design; prepare opinions
of cost; perform estimated economic analyses, prepare project schedules; prepare
construction documents, drawings, and specifications; prepare regulatory permit
applications and required back-up information; participate in contract negotiations
for the turbine/generator/controls equipment (TGC) package; participate in
regulatory and legal mitigations; make presentations; prepare reports; perform
construction administrative services; perform all other work specified herein; and
perform any other related services that would normally be required to implement
the removal of the existing turbine/generator/controls (TGC) and installation of a
suitable hydroelectric generating facility at the Jackson Mills site.
B. Standard Scope of Services
1. Acquisition and Review of Data
Gather data and available information pertinent to the project, including
previous drawings and reports, regulatory requirements, and any other data
relative to the design and construction of the project. Verify the accuracy of