Schedule of Vajues
LFG Header Replacement
(Add on to 2019 Landfill Gas System Expansion)
Four Hills Land&ll
Nashua, New Hampshire
Item Description Quantity Bid Unit Cost Extended
No, scrip (w/ units) ($/units) Prices ($)
1__|Connect to Existing 12"9 Header 1 LS $2,000.00| LS $2,000.00
Furnish & Insta}] Landfill Gas Conveyance Pipe
a. 6"@ Solid SDR 17 HDPE Pipe 720 LF $70.00] LF $50,400.00
b, 12"@ Solid SDR 17 HDPE Pipe 620 LF $87.00 | LF $53,940.00
3 |Furnish & Install Isolation Valve (12")} 1 LS |} $5,000.00! LS $5,000.00
4 |Reconnect Wellhead Assemblies 28 EA $850.00} EA $23,800.00
Total] $135,140.00
Note:
1.
All pipe Jengths in the table above are plan view lengths (2D) and do not account for slope.
PA30002\3066.17\ Source Files\2019 Gas Praject\Replacement Header\ Bid tem Defs\,
20390904
Schedule of Vatiesxise
Page 1 of 1
Sanborn Head & Associates, Inc.