Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 2/5/2020 - P30

Finance Committee - Agenda - 2/5/2020 - P30

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Fri, 01/31/2020 - 12:43
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
30
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020520…

Crown Hill Pool Building Upgrades
Bid Specification Pricing Schedule
IFB0643-101819

Material and labor to include the following tasks:

All disposal fees will be no charge at the Nashua Landfill

Roof
e Strip and dispose of existing roof layers
e Furnish and install new lifetime architectural shingles (color tbd)
e Furnish and install new white 8” aluminum drip edge
Fumish and install ice and water shield 6 ft up on soffits and valleys
All pipes receive new flashing boots
e Fumish and install up to 64 sq ft of damage or rooted plywood if necessary

Cost 17, OPS. OO

Exterior doors
e Remove and dispose of 4 existing metal exterior doors. Save all locking knobs
e Fumish and install 4 new metal doors into existing steel welded frames
e Install existing locking door knobs
¢ 1 door to have louvered bottom to match existing Ss yo, ? 5, gO
Cost

Siding
e Remove and dispose of existing plywood siding at building gables
e Furnish and install approx. 400 sq of white paintable plastic V match vertical board siding
e Fumish and install approx. 75 linear feet x 12” vented vinyl soffit
e Furnish and install approx. 170 linear feet of metal wrap on existing wood trim

Cost YD Od SO

Counter tops
@ Remove and dispose of girls and boys bathroom counter tops
@ Remove and dispose of 3 sinks and faucets
e Install new laminate counters (color tbd)

e Install 3 new porcelain sinks and faucet kits oS
Cost 7. PE,

Total Cost 3 “t, 207. ~

Page Image
Finance Committee - Agenda - 2/5/2020 - P30

Footer menu

  • Contact