Crown Hill Pool Building Upgrades
Bid Specification Pricing Schedule
IFB0643-101819
Material and labor to include the following tasks:
All disposal fees will be no charge at the Nashua Landfill
Roof
e Strip and dispose of existing roof layers
e Furnish and install new lifetime architectural shingles (color tbd)
e Furnish and install new white 8” aluminum drip edge
Fumish and install ice and water shield 6 ft up on soffits and valleys
All pipes receive new flashing boots
e Fumish and install up to 64 sq ft of damage or rooted plywood if necessary
Cost 17, OPS. OO
Exterior doors
e Remove and dispose of 4 existing metal exterior doors. Save all locking knobs
e Fumish and install 4 new metal doors into existing steel welded frames
e Install existing locking door knobs
¢ 1 door to have louvered bottom to match existing Ss yo, ? 5, gO
Cost
Siding
e Remove and dispose of existing plywood siding at building gables
e Furnish and install approx. 400 sq of white paintable plastic V match vertical board siding
e Fumish and install approx. 75 linear feet x 12” vented vinyl soffit
e Furnish and install approx. 170 linear feet of metal wrap on existing wood trim
Cost YD Od SO
Counter tops
@ Remove and dispose of girls and boys bathroom counter tops
@ Remove and dispose of 3 sinks and faucets
e Install new laminate counters (color tbd)
e Install 3 new porcelain sinks and faucet kits oS
Cost 7. PE,
Total Cost 3 “t, 207. ~