ARTICLE 2 - WORK TO BE PERFORMED
Except as otherwise provided in this contract, CONTRACTOR shall furnish all services,
equipment, and materials and shall perform all operations necessary and required to carry out and
perform in accordance with the terms and conditions of the contract the work described.
DESCRIPTION OF WORK:
Material and labor to include the following tasks:
All disposal fees will be no charge at the Nashua Landfill
Roof
e Strip and dispose of existing roof layers
Furnish and install new lifetime architectural shingles (color TBD)
Furnish and install new white 8” aluminum drip edge
Furnish and instal! ice and water shield 6 ft. up on soffits and valleys
All pipes receive new flashing boots
Furnish and install up to 64 sq. ft. of damage or rooted plywood if necessary
Exterior doors
e Remove and dispose of 4 existing metal exterior doors. Save all locking knobs
e Furnish and install 4 new metal doors into existing steel welded frames
e Install existing locking door knobs
e 1 door to have louvered bottom to match existing
Siding
e Remove and dispose of existing plywood siding at building gables
e Furnish and install approx. 400 sq. of white paintable plastic V match vertical board siding
® Furnish and install approx. 75 linear feet x 12” vented vinyl soffit
e Furnish and install approx. 170 linear feet of metal wrap on existing wood trim
Counter tops
® Remove and dispose of girls and boys bathroom counter tops
Remove and dispose of 3 sinks and faucets
Install new laminate counters (color TBD)
Install 3 new porcelain sinks and faucet kits
Page 2 of 12