Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 4/15/2020 - P248

Finance Committee - Agenda - 4/15/2020 - P248

By dnadmin on Mon, 11/07/2022 - 13:32
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
248
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

Request for Proposal ol ‘fe a
23

Jackson Mills Date: Mar 12, 2019
+ Powering Business Worldwide
Revision: 0.0

1. INTRODUCTION

Eaton Corporation has a successful record of deploying turnkey hydro electro-mechanical
modernization projects spanning more than 50 years in government, utility and privately-owned
hydro-electrical facilities. We are well positioned with an experienced and committed team to
lead the Jackson Mills electrical modernization with a modern and cost-effective solution. This
skilled team will improve your ability to deliver quality power and improve the reliability and
functionality of pumping water and generating electricity.

Recently, Eaton Corporation has successfully automated a variety of systems in the power
generation and distribution industries. Notable projects include:

— Green Mountain Power, Little River Station: Repowering and modernization, including
exciters, governors, automation and protection systems

— Green Mountain Power, Ascutney Gas Turbine: Automation and excitation replacement

— Bureau of Reclamation, Shasta & Keswick: Excitation modernization

— Titan Americas: Plant Automation including SCADA, automation and protection systems

Eaton’s comprehensive technical proposal proves our ability to meet the requirements of the
specification, deliver on the goals of facility uniformity and maintain an aggressive, flexible
schedule through design and construction.

Eaton Corporation hereby offers to provide the services as detailed below, at the prices and on
the terms and conditions exclusively set forth in this offer.

1.1 EXECUTIVE SUMMARY

The following proposal and scope of work has been developed in response to the Request for
Quote and includes the design and procurement of the required protection and control
equipment associated with the Mavel supplied modern turbine-generator equipment. This
proposal assumes the new synchronous generator will be rated at 1226 kW, 4160 V.

To develop the most creative and cost-effective solution that meets the specification provided,
Eaton Corporation is providing a base price, with several options that either improve reliability,
decrease plant outage and downtime, or other recommended system enhancements.

1.2 PROJECT SUMMARY

The existing Jackson Mills Hydroelectric Generation Station is currently under review for
repowering. The scope of work outlined as part of this offer, is limited to the electrical and
control system as part of the repowering and based on the turbine-generator data provided by
Mavel and referenced as part of this offer.

2. ENGINEERING SERVICES SCOPE OF WORK

Eaton proposes to upgrade the Jackson Mills Station using an integrated approach. The basis
for every successful project is sound engineering and design as well as flawless execution.

© 2019 Eaton Corporation. This submittal contains material which is Proprietary and Confidential to Eaton Corporation. 4 Pp a
It may only be used to evaluate and respond to this proposal. Unauthorized use and/or disclosure is strictly prohibited. | g €

Page Image
Finance Committee - Agenda - 4/15/2020 - P248

Footer menu

  • Contact