121 Mount Vernon St., Boston, MA 02108, USA
Phone: +1617 242 2204 Fax: +1617 242 2205
www.mavel.com
Advantages of this solution are:
1. Power Potential. The TGC arrangement will meet the 1,000 kW maximum requirement but has the
potential for increased output if permits are in place. This would be readily accomplished via control
modifications.
Civil Modifications. The TGC arrangement, as proposed, will require minimal civil modifications. The bulb
turbine unit is an easy, compact solution that will fit within the existing structure. The intake is designed
to provide a smooth transition into the turbine. The draft tube will require change in order to assure
performance of the unit and provide a straight flow path.
|
Fish Passage. The MAVEL KA1800K4 turbine with four blades and operating at 240 rpm speed will
minimize the potential for impact on fish passage through the turbine. There will be no impact to the
upstream fish passage facility.
|
More information on Mavel’s Kaplan Bulb turbines are provided in Section 6: Appendix C Standard Kaplan Turbine
Technical Specifications.
Mavel will purchase all materials and major subcomponents from either American or European sub-suppliers.
The synchronous generator will be provided by Czech producer GAEM. The completed Bid Forms and Section 6:
Appendix D provide additional technical information on the generator and general information about GAEM.
The Electrical Balance of Plant (“EBOP”) sub-supplier is Eaton Corporation with base in Lewiston, ME. Eaton will design
and deliver the EBOP equipment per the RFP scope and requirements. Startup and commissioning services can be
provided at such time.
1.3 Commercial Terms
Not Used
Project No. 0-29029.Rev.3 www.mavel.com Jackson Mills Upgrade