2019 CIPP LINING PROJECT
4/7/2020
Kenyon Pipe Line Inspection Change Order 1 Change Order 2 Kenyon Pipe Line Inspection
Item Contract Value SANE etna SABRE SESS S Contract Value - Amended
No Quantity Units Item Description
Unit Price Total Price Quantity | Total Price | Quantity Total Price Quantity Total Price
Remove Existing Sewer Service at Point
ic 48 LF {Repair and Replace with 6" PVC SDR-35 $350.00 $15,800.00 (48) {516,800.00} 0 $0.00
Sewer Pipe Including Wye at Sewer Main
Video Inspection of Sewer Lines Not
iD 20,000 LF |Scheduled for Lining {Pipe $2.00 $40,000.00 40000 $80,000.00 65525 $131,050.00 125525 $251,050.00
Sizes 8" to 24")
Cutting and Removal of Protruding
1E a7 EA A F A A
Lateral Pipe Up to 12" Diam. $250.00 $11,750.00 50 $12,500.00 97 $24,250.00
1F 1,344 VF Manhole Cement Lining $135.00 $181,440.00 0 50.00 1344 $181,440,00
16 50 VF {Manhole Epoxy Lining $350.00 $17,500.00 {50) (517,500.00) 0 $0.00
1H 100 EA _|Manhole Invert Reconstruction $850.00 $85,000.00 (100) {585,000.00} 0 $0.00
§ Manhole [nt | Drop A\ bi
u 10 EA power Manhole infernal Drop assembly | §1,850.co | $18,500.00 {10} ($48,500.00) Q $0.00
(Up to 8 VF)
1K 90 ve [foot Diameter Sewer Manhole $600.00 $54,000.00 (90) | ($54,000.00) 0 $0.00
(Replace or Construct}
5-foot Diameter Sewer Manhole
ikK 6 . . . .!
1 VF (Replace or Construct) $750.00 $12,000.c0 {16} ($12,000.00} 0 $0.00
Replace Sewer Manhole Frame and
1 25 VF iCaver (Incfuding up to 18" of manhole $1,700.00 $42,500.00 (25) {$42,500.00} 0 $0.00
remodeling}
Sof7