Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 4/15/2020 - P86

Finance Committee - Agenda - 4/15/2020 - P86

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 04/10/2020 - 14:58
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/15/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__041520…

EXHIBIT B
SCOPE OF SERVICES, CONTRACT TIME, AND FEE SCHEDULE

Scope of services

SPECIFICATIONS: The scope of work described below includes services for performing applications of
Procellacor EC (florpyrauxifen-benzyl) aquatic herbicide treatments in the Nashua River upstream of the
Mine Falls dam (90.5 acres); Depth Charge (2,4-D& flumloxazin) aquatic herbicide treatments in the Mill
Pond and Canal (38.6 acres), and Sonar (Fluridone) aquatic herbicide treatments in Sandy Pond (4.5 acres) to
control aquatic invasive species. Up to one each algae and emergent vegetation treatment may be performed
if deemed necessary during the spring survey.

Permitting:
1. SOLitude staff will be responsible for the following:

a. Preparing and filing a Special Permit Application and supporting documentation with the NH
Division of Pesticide Control,

b. Notifying affected abutters of the permit application submission; list of abutters to be
provided/updated by Client.

c. Publishing a legal notice in a local newspaper about the permit application filing.
Lake Aquatic Weed Control:
1. Nashua River: Growth of variable milfoil as specified by NHDES shall be treated and controlled through
the application of Procellacor EC™ (Florpyrauxifen-benzyl) systemic aquatic herbicide, as required for

control of the specific varieties of aquatic weeds found in the treatment area at the time of application.

2. Mill Pond and Canal: Depth Charge (2,4-D & flumloxazin) will be applied at a targeted rate of 20.5
qts/ac (Canal) and 25.7 qts/ac (Pond) to achieve long-term control of variable milfoil.

3. Sandy Pond: Perform spring survey, up to 2 applications of Sonar (Fluridone) herbicide/algaecide
treatment (if necessary), post-treatment survey, preparation and submittal of State reporting as required.

Perform algae and emergent treatment (1 of each authorized) if deemed necessary during spring survey.

4. Applications will be performed using SOLitude’s specially designed and calibrated treatment systems and
boats. GPS systems will be used to provide real-time navigation and to record treatment passes.

5. Pre-treatment inspection of designated areas will occur prior to treatment.

6. Notification of affected abutters and City officials via certified mail — return receipt will occur prior to
treatment in accordance with Special Permit conditions.

7. Publication of legal notices in a local newspaper for two consecutive weeks will occur prior to treatment
in accordance with Special Permit conditions.

8. Shoreline posting will be coordinated and performed prior to treatment in accordance with Special Permit
conditions.

Page Image
Finance Committee - Agenda - 4/15/2020 - P86

Footer menu

  • Contact