Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/6/2020 - P133

Finance Committee - Agenda - 5/6/2020 - P133

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
133
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

JWP instail

The 2 Jacket Water Pumps, tying into each of the generator engines were not shown on contract drawings, The scope of work to install these pumps
consisted of cutting unistrut to match the width of WHB ¢ & 2. Two pieces of unistrut were cut at 3'2" to rest parallel from each other across the top of

Scope: gach WHB frame. Upon cutting the unistrut to size, it was then anchored into the WHB frames. Each JWP were then bolted to the unistrut, and
supported by threaded rod anchored to the unistnut support system in the ceiling. This method of install was done on beth frames, requiring 2 laborers
and 7.5 days worth of work.

4-SUPPLEMENTAL COSTS
DESCRIPTION ary RATE. UNIT SUBTOTAL
T DRA
SUBTOTAL $0.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 43.00% $575.96
6-GC WORK TOTAL
SUBTOTAL (Item 1424+3+4) $1,915.40
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST QTy COST TOTAL
SUBTOTAL
— SUBTOTAL WITH MARKUP
[8-FEE
GC (15% X tems 125 + 15% X ems 28364 + 5%, 7.5% or 10% X tte 7) $287.31
[8-SUBTOTAL $2,202.71
BOND (1% X item) $22.03
GENERAL LIABILITY (1% X Hem 3} $22.93
9-TOTAL {Item 8 + Bond + General Liability} $2,246.76

Page 3 of 3 3/3/2020 - 4:30 PM

Page Image
Finance Committee - Agenda - 5/6/2020 - P133

Footer menu

  • Contact