  2. Finance Committee - Agenda - 5/6/2020 - P132

Finance Committee - Agenda - 5/6/2020 - P132

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
132
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

JWP Install

The 2 Jacket Water Pumps, tying into each of the generator engines were not shown on contract drawings. The scope of work to install these pumps
consisted of cutting unistrut to match the width of WHB 1 & 2. Two pieces of unistrut were cut at 3'2” to rest parallel from each other across the top of

Scope: each WHB frame. Upon cutting the unistrut to size, it was then anchored into ihe WHE frames. Each JWP were then bolted to the unistret, and
supported by threaded rod anchored to the unistrut support system in the ceiling. This method of install was done on both frames, requiring 2 laborers
and 1.5 days worth of work,

1-LABOR
CATEGORY HRS RATEIHR PREMIUM SUBTOTAL LINE TOTAL TOTAL
08
laborers, 1.5 days
00
PIPEFITTER
$1,339.44
2-MATERIALS
DESCRIPTION QTy UNIT UNIT GOST SUBTOTAL
i
SUBTOTAL 5 -
3-EQUIPMENT CS
CATEGORY QTY RATE UNIT SUBTOTAL
VATOR PC300 35 HR
SUBTOTAL $0.00

Page 2 of 3 3/3/2020 - 4:30 PM