120
HW Heat Exchanger 1 & 2 Support Frame
Scope: Fabricate, install, and paint 2 Support Frames for HW HX 1 &2. These frames will be fabricated in accerdance to Waldrons drawing on RFI #45,
4-SUPPLEMENTAL COSTS
DESCRIPTION ary RATE
UNIT
SUBTOTAL,
9-TOTAL [iter & + Bond + General Liability)
SUBTOTAL $0.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 43,00% $191.99
[e-Gc WORK TOTAL
SUBTOTAL (Item 1424344) $1,098.20
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST ary GOST TOTAL
Ls
SUBTOTAL $1,634.78
SUBTOTAL WITH MARKUP $1,880.00
|5-FEE
GC (15% X Hems 185 + 15% X Hems 28384 + 5%, 7.5% or 10% X Item 7) $328.21
|8-SUBTOTAL $3,306.40
BOND (1% X Hema} $33.06
GENERAL LIABILITY (1% X Item 8) $33.06
$3,372.53
Page 3 0f3
3/3/2020 - 2:10 PM