HW Heat Exchanger ¢ & 2 Support Frame
Scope: Fabricate, install, and paint 2 Support Frames for HW HX 1 &2, These frames will be fabricated in accordanca to Waldrons drawing on RFi #46.
4-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL
4 laborer, 7 day
$446.48
2-MATERIALS
DESCRIPTION QTy UNIT UNIT COST SUBTOTAL
PLATE HR 436 1/4" 820 t EA $ 142.00 3 142.00
PLATE HR 436 1/4" 820 t EA $ 143.00 $ 443,00
ANGLE HR 3X 3 X 1/4” 4 EA 3 52.00 § 52.00
Rustoleum Heat Resistant Coating 4 BA 3 59,59 $ 559.59
Rustoleum Solvent Primer , 1 - EA , $ 63.14 $ 63.14
i I i i
SUBTOTAL 3 459.73
3s-EQUIPMENT
CATEGORY QTy RATE UNIT SUBTOTAL
VATOR PC300 i 80.35 HR
SUBTOTAL $0.00