Weirs Attachament
Scope: Proposal for change of material requirements for FRP weir plates, as well as installation and reccating of existing weirs: Set up sfaging and drill aproximately (84)
3/8" holes in existing weirs, Assist Painters bring in blast media and removing blast media and disposai,
Gasket: * Addition of 3/8" thick x 6" wide 40 durometer Shore A neoprene rubber to be mounted between
new FRP weir and existing aluminum weir. 1 month for 2 Tanks- Set up staging, clearing debris, surface prep for painters, drilling wiers, site clean up after painting.
9-TOTAL (item 8 + Bond + General Liability)
| updated to reflect the credited items
4-SUPPLEMENTAL COSTS
DESCRIPTION QTy RATE UNIT SUBTOTAL
LASBUILT DRAWINGS i $0.00:
WARRANTIES i $0.00;
TESTING $0.00:
$0.00
.00
TRAVEL $0.00
$0.00
STORAGE $0.00
$0.00
FUEL .00
TELEPHONE .00
$150
SUBTOTAL $150.00
5-BURDEN
CATEGORY RATE
BURDEN RATE 34.00% $5,139.71
6-GC WORK TOTAL
SUBTOTAL (item 1+2+9+4) $26,846.71
7-SUBCONTRACTORS WORK
SUBCONTRACTOR UNIT COST QTy cosT TOTAL
International LS 11,006.00 11,000.06
SUBTOTAL $71,000.00
GC MARKUP (typically 10%) x (Subcontractor cosi/7.15} $956.52
B-FEE
GC (15% X Items 185 + 15% X items 28384 + 5%, 7.5% or 70% X Item 7) $4,983.53
B-SUBTOTAL $42,830.24
BOND (1% X Ifem8) $358.06
GENERAL LIABILITY (1% X Iter 8) $358.06
$43,546.36
Page 3 of 4
3/5/2020 - 11:53 AM