Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/6/2020 - P82

Finance Committee - Agenda - 5/6/2020 - P82

By dnadmin on Mon, 11/07/2022 - 13:31
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

Weirs Aftachement

Scope: Proposal for change of material requirements for FRP weir plates, as well as installation and recoating of existing weirs: Set up staging and drii aproximately (84)
3/8” holes in existing weirs. Assist Painters bring in blast media and removing blast media and disposal.

Gasket: * Addition of 3/8" thick x 6" wide 46 durometer Shore A neoprene rubber to be mounted between
new FRP weir and existing aluminum weir, 1 month for 2 Tanks- Set up staging, clearing debris, surface prep for painters, drilling wiers, site clean up afer painting,

1-LABOR
CATEGORY HRS RATE/HR PREMIUM SUBTOTAL LINE TOTAL TOTAL
$77.34 187.20
LABORER 7 $8 .60
72 $0.00
OPERAT! $72.17 00
PLUMBER .69 .!
$56.06 .00
P ‘4. .00
MILLWRIGHT $69.72 .!
30.00
TRUCK DRIVER 00
BTOTAL $15,116.86
2-MATERIALS
DESCRIPTION QTY UNIT UNIT COST SUBTOTAL
Estimated
FFE 3/8" thick x 6" wide duramete 1 2,700,00 § 2,700.00 $ 2,700.00
Durnpsier / Disposal 1 455.00 $ 455.00 $ 455.06
_Drill Bits # Consumabies 1 125.00 § 125.00 $ 125.06
SUBTOTAL $ 3,286.00
3-EQUIPMENT
CATEGORY HRS RATE UNIF SUBTOTAL
IEXCAVATOR PG300 $180.35 HR $0.00:
EXCAVATOR CAT 330 $100.37 : HR $0.00:
EXCAVATOR CAT 320 $58.71: HR $0.00
DUMP TRUCK $61.23 HR 30,00;
TOOL TRUCK 80.0 317.00 © HR $1,360.00
FRONT END LOADER $66.40 HR 30,00
BOZER $54.42 | HR $0.00
COMPACTOR (WALK BEHIND) $36.88 | HR $6.00
ROAD SAW $35.88 ; KR $0.00
HYDRAULIC BREAKER $45.51 | HR $6.00
CAT 420 BACKHOE 341.49 : HR $0.06
STAGING 20 $30.01 | HR $600.20
COMPRESSOR 185CFM $15.08 | HR $0.00
SISSOR LIFT 19" $4.18 | HR $0.00
MAG DRILL 40 $120.00 | DAY 31,200.06
SUBTOTAL $3,160.20
Page 2 of 4 3/5/2020 - 12:53 AM

Page Image
Finance Committee - Agenda - 5/6/2020 - P82

Footer menu

  • Contact