Fueling Facility Upgrade
Neshus OF
Gonstruction Cost Breakdown
Apel B, 2020
Site Wart
Demo Concreta & Asphalt S700
E88 Canopy Foundations, Slab Prep 6" Gravels $41,000
ES&S Canony Dreing, SOLF 3° PVG 82,705
Asphalt Patch, 4° 33,800
Curb Restoration
Striping By OPV
Landscaping, Sod & Seeding By OPW
AST &UG Piping System
Demniition of Existing Fual & Wigs Lebor $15,649
Cloan & Inspecl ASTs $18,228
AST / UST Upgrade Work, Underground Piping 537,147
DES Complence Work (par 13 ttem Est) $34,605
Preseure Regulating Piping $13,431
Hoses & Nozies, Zea é $2,420
Hose Mest wretractor, Diesel Only, 4ea $2,804
Fuel Equipment
APT Piping $7,205
APT Fiilings $2,238
Sumps & Misc. $3,122
Velves, Inc! Preagure Reg $3,155
Istand Form $3,572
Dispenser, Bannstt 330,800
Shear Vaivas, dea e508
Canopy Lights, HULOW, bea, plus sensor $4,556
Oeeals, Signage e242
Canopy
Canopy Staal, 24' x 4f7 $22,708
Canopy Erection, 24" x 40" 99,600
Cenopy Flee Supereagion, PyroChem, Nozzle
Height 45'-7" shove driva matt. $20,084
Wire Fire Guppreselon 82,976
Electricel
MMaterist $12,647
Labor 320,088
Low Voliege Disconnect $1,069
Cenerste
Canopy Foundations $4,480 $5,499
Bollards [retell Si224 $1,224
T&P Fiat, Placa & Finish $13,871 $13,871
TSP Flat, Foam & Bax $16,189 $15,158
Rebar & Wire Mesh $7,280 $7,280
Yard Work 2285
Painting 81488 51,486