Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/6/2020 - P22

Finance Committee - Agenda - 5/6/2020 - P22

By dnadmin on Mon, 11/07/2022 - 13:30
Document Date
Fri, 05/01/2020 - 14:46
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/06/2020 - 00:00
Page Number
22
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050620…

ARTICLE 2 - WORK TG BE PERFORMED

Except as otherwise provided in this contract, CONTRACTOR shall furnish all services,
equipment, and materials and shalj perform all operations necessary and required to carry out and
perform in accordance with the terms and conditions of the contract the work described.

DESCRIPTION OF WORK (CONTRACTOR):

> Site Work
None

> AST & UG Piping System
Demation of Existing Fuel & Misc. Labor;

Clean & Inspect ASTs;

AST | UST Upgrade Work, Underground Piping;
DES Compliance Work {per 16 item list);
Pressure Regulating Piping;

Hoses & Nozzles, 8ea; and

Hose Mast w/retractor, Diesel Only, dea

> Fuel Equipment,
Shear Valves, dea;

Canopy Lights, HI/LOW, Bea, plus sensor; and
Decals, Signage

> Canopy
Canopy Erection, 24’ x 40

Canopy Fire Suppression, Pyro Chem, Nozzle Height 16' -7"above drive matt; and
Wire Fire Suppression

» Electrical
Material;
Labor; and
Low Voltage Disconnect

» Concrete
Bollards Install;
T&P Flat, Place & Finish; and
Rebar & Wire Mesh

> Vard Werk
Painting

>» Materials & Misc. Expenses
Grout Canopy Columns;

Site Labor, Misc.,

Saw cut Slabs & Seal & Caulk;
Misc. Materials: and

Concrete Protection (Blankets)

> Yard Equipment
Fire Extinguishers (2); and

Bollards, 6”

Page 2 of 13 oS

Page Image
Finance Committee - Agenda - 5/6/2020 - P22

Footer menu

  • Contact