DROPIN™ Floor Box Kits
Fastest box installation!
1 Determine box focation,
taking care to avoid
stractaral framing
members. Using hole
saw cul 4-1/4" diameter
opening through floor
and subfloar.
a
Pull cable. Enstall in box
with supplied cable
connector, Attach box to
bracket with (3) #8 x 1/2"
sheet metal screws
(supplied) Ehrough the
U-shaped cut outs in the
box flange.
nm
oy
Insert mounting
bracket. Using indicator
marks align bracket for
proper receptacle
onentation, Tighten (3}
wing screws to secure
bracket to floor,
Wire receptacle, Install in
box, Attach supplied
gasket support plate to
receptacle with #6 x 1/2"
screw,
Non-metallic Blank Covers
Cover Installation
Install gasket. Adach metal
or non-metallic blank cover
to box with (3) #8 x 1/2”
flathead machine screws.
When using the in-use
non-metallic cover, substitute
the colored in-use plate for the
black gasket support plate.
: Arlington's LISTED DROPIN™ Floor Box et
2 Xits are the. fastest way to install a BOX oa
- nearly f flush i in an EXISTING floor
: Designed : for flush, neat installations ae
cand TIME-SAVINGS these floar boxes |."
-Sinstall with a SINGLE hole saw and sit .
2 just 1/8' M off the floor!
‘DROPIN box accommodates most 3, 5 oes
“standard covers, ‘but Aslington’ s round
“low profi ile covers seat flush into:the
non-metallic. ring, reducing trip hazard, i
BRASS OR NICKEL PLATED BRASS ©
“Metal Covers have =
dwa‘gasketed flip lids *
“that keep water out
and protect the box, :.
: DROPIN kits are s also available. my
“with NON- METALLIC ‘Blank Covers. o
2 They're perfect for covering unused
"fight almond, gray, ‘caramel, black
‘each with a
‘matching © :
“non-metallic
mounting bracket, gasket and compet 2
ting. : 2
“yPatent
“pending | -
4 Stauffer industrial Park
- Scranton, PA 18517.
-BO0/233.4717
- Fax 570/562.0646 | .
wow, aifittings. com. ce Ue
