Finance Committee - 05/06/2020 Page 10
Yea: Alderman Klee, Alderman Harriott-Gathright, Alderwoman Kelly,
Alderman O’Brien, Mayor Donchess 5
Nay: 0
MOTION CARRIED
From: Dan Kooken, Purchasing Manager
Re: Primary Tank Upgrade — Change Order 4 (Value $49,336) Department: 169 Wastewater; Fund:
WERF and SRF Loan
MOTION BY ALDERMAN HARRIOTT-GATHRIGHT TO ACCEPT, PLACE ON FILE, AND APPROVE THE
PRIMARY TANK UPGRADE — CHANGE ORDER 4 FOR THE CONSTRUCTION OF UPGRADES TO THE
PRIMARY TANKS AT THE WASTEWATER TREATMENT FACILIT IN THE AMOUNT OF $49,336 TO
METHUEN CONSTRUCTION. FUNDS ARE AVAILABLE IN DEPARTMENT: 169 WASTEWATER; FUND:
WERF AND SRF LOAN, BY ROLL CALL
ON THE QUESTION
Mayor Donchess
Mr. Boucher is here | believe.
Dave Boucher, Wastewater Superintendent
Yes, Mr. Mayor. Dave Boucher, Wastewater Superintendent. This change order is for our primary tank
upgrade at the Wastewater Facility. This project is for the modification and rehab of the existing tanks at our
wastewater facility including an additional above-ground control building. The cost is for extra surface coating
to our thickening tanks that were discovered during the project. Also extra digging that was needed for
electrical conduit. We came across an unforeseen existing pipe, so it had to be relocated. And also upgrades
to a PLC Processor for our new control building. I'll take any questions.
Alderwoman Kelly
| have a question.
Mayor Donchess
Alderwoman Kelly.
Alderwoman Kelly
Thank you, thank you — appreciate it, nice to see you. My question is a little bit in jest but | want to ask do we
have a brand new up to down wastewater treatment facility at this point.
Dave Boucher, Wastewater Superintendent
No, we do not. No. We have several projects going on at the Wastewater Facility and outside and more to
come.
Alderwoman Kelly
OK.