((NORTH PCO #02
CONSTRUCTION MANAGEMENT
NorthPoint Construction Management Project: 19056 - 14 Court St Nashua
22 Hampshire Drive 14 Court Street
Hudson, New Hampshire 03051 Nashua, New Hampshire 03060
Phone: (603) 546-2000
Fax: (603) 548-2002
Prime Contract Potential Change Order #02: Requests from Nashua Fire
Departmen
TO: City of Nashua Purchasing Dept. FROM: NorthPeint Construction Management
229 Main Street 22 Hampshire Drive
Nashua, New Hampshire 03061 a Hudson, Naw Hampshire 03051 -
PCONUMBER/REVISION: 02/0 . oe CONTRACT: ~ 4/«44 Court St Nashua Prime Contract
REQUEST RECEIVED FROM: Jay Hunnewell (Clty of Nashua CREATED BY: ‘Jillan Shedd (NorthPolnt Construction __
Purchasing Dept.) Management)
STATUS: Pending - In Review GREATED DATE: = 42872020
REFERENCE: os PRIME CONTRACT None a
CHANGE ORDER:
FIELD GHANGE: Yes . . oa
LOGATION: ACCOUNTING Amount Based
METHOD:
SCHEDULE IMPACT: § days PAID IN FULL: No ,
A SRM a Oe
“TOTAL AMOUNT: $13,282.50
Fe ee eS 1h ee ek ee eT
POTENTIAL CHANGE ORDER TITLE: Requests from Nashua Fire Department
GHANGE REASON: Client Request
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract ia Changed As Follows)
fl Py PU eee TP Peete el Fi je Depanmeni
Requests from ua Fire Department
The below mentioned Items were looked at by request of Nashua Fire Department and in conjunction with the Lifa Safety Fire Protection walk through.
Please note we were unable to get into the space occupied by Liquid Therapy.
* Add head in first floor bathroom
* Add head In vestibule entry
« Add head where we show a wall that Is no longer going to ba thera
* Move (2) heads at top of 2nd floor landing
« Add head in entry to dressing room
+ Add 4° grooved control vaive to dry system
* Add flow switch to dry system
* Add head to soffit on 2nd ffoor
* Pipe out 2° drain of dry valve
« Relocate two heads In light equipment room
TOTAL FOR ABOVE C.0.R. BASE BID WORK $5175
Suggestions noted below.
* ADD ALT 1- Change all existing heads out to new quick response head, (all head will be outdated In 2.5 years, $4700.00
* ADD ALT 2- Repiace endeting alr compressor, §2200.00
ATTACHMENTS:
# SubJob Cost Code Description Type Amount
1 NA 15-300 - Fire Protection 6.0.R. BASE BID WORK Subcontractors $4,175.00
. ADD ALT 1- Change ail exdating heads out to new quick response
ae 15-000 = Figs Protection heed. (all head wil be outdated in 2.5 yeara) Sttocnrackrs en
NerthPoint Construction Management page 1 of2 Printed On: 4/28/2020 04:41 PM
