fi q NORTH PCO #01
CONSTRUCTION MANAGEMENT
Project: 19056 - 14 Court St Nashua
14 Court Street
Nashua, New Hampshire 03060
NorthPoint Construction Management
22 Hampshire Crive
Hudson, New Hampshire 03051
Phone: (603) 546-2000
Fax: (603) 546-2002
Prime Contract Potential Change Order #01: Additional fire alarm fixtures in
areas not covered in original RFP or walkthrough
NorthPoint Construction Management
TO: City of Nashua Purchasing Dept. FROM:
229 Main Street 22 Hampshire Drive
Nashua, New Hampshire 03061 Hudson, New Hampshire 03051
PCO NUMBER/REVISION: o1/0 CONTRACT: 1-14 Court St Nashua Prime Contract
REQUEST RECEIVED FROM: Mike Simmons (DEI Systems, LLC} CREATED BY: Jillian Shedd (NorthPolnt Construction
Management}
STATUS: Pending - In Review CREATED DATE: 4/1/2020
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: Yes
LOCATION: ACCOUNTING Amount Based
METHOD:
SCHEDULE IMPACT: 10 days PAID IN FULL: No
TOTAL AMOUNT: $15,290.00
POTENTIAL CHANGE ORDER TITLE: Additional fire alarm fixtures in areas not covered in original RFP or walkthrough
CHANGE REASON: Existing Condition
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
CE #001 - Additional fire alarm fixtures in areas not covered in original REP_or walkthrough.
Additional fire alarm fixtures in areas not covered in original RFP or walkthrough, as directed by Fire Marshall Adam Pouliot.
ATTACHMENTS:
FCSQ16006.pdi_ _2737 COR#1 Additional Fire Alarm.pdf_ _CO#1 Backup.pdf_
a Sublob Cost Code Description Type Amount
1 a 46-100 - Wiring Mathods crwalktrouge fixtures in areas not covered in original RFP Subcontractors $13,900.00
2 | NA 17-100 - General (FSI Code 1} NPCM 10% OH & Fee Overhead $1,390.00
Subtotal: $15,290.00
Grand Total: $15,290.00
City of Nashua Purchasing Dept. NorthPoint Construction Management
229 Main Street 22 Hampshire Drive
Nashua, New Hampshire 03061 Hudson, New Hampshire 03051
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
NorthPoint Construction Management
page 1 of 1
Printed On: 4/1/2020 02:17 PM