un |
ay i
oO |
wn
ba
co
|
Ln
mn
at |
ka:
Im:
MO
|
5
Ih
Waterproofing
: Concrete Surfaces
Deletes ‘Section 530
' Barrier Membrane
_ Bridge Fence
Structural Timber
| Preformed Joint Filler
Division 600
603
kT
a
i!
oi
oO |
in
|
mn
(a)
co
can
>
KO
|
on
rare
al
|
cm
Pe
al
|
i
Plastic Pipe
Plastic Pipe
Guardrail
» Detectable Warning
: Devices
Curbs
Cofferdam for Sign
Installation
Erasion Control |
Division 700
“702
3.3. 5 - ‘Updates the laydown temperature
range
1.2, 1.3, 2.2, 2.6 & 2.8 - Allows
aluminum ties for attaching fencing to
bridge rail
2.2, 3.4.4 % 3. 4, 5- “Adds specific
references to AWPA Standards & wooden
piles
2.4 - Revises Preformed Joint Filler
Requirements
2.3, 2.6 & 2.7 - Updated to include
Polypropylene Pipe and associated UV
Requirements
2.13 - Added for Contractor's Option
2.3 & 2.2 - Updated to include
Polypropylene Pipe
2.2 - Adds specifie references to AWPA
_Standards & wooden piles
2, 6 - Updates Detectable Warning | Device
Requirements
2.4.1.1 + Allows the substitution of PG 76-
28 binder i in lieu of fibers
5.1.5 - Revises payment for sheeting and
shoring for sign structures
' 1.1 - Matting Section Revised and Pay
Items Revised (04/02/18)
1.1 - ‘Stabilization’ changed to 'matting'
Incorporates BFM, FRM and SMM into the
Standard Specs (07/06/18)
1.2.1 - Add Erosion Control Plans to list of
items to furnish for SWPPP (11/07/18)
3.1.5 - Update construction dates for
allowable area of exposed, unstabilized
soi! (11/07/18)
/ Amends Table 702-1 & 702-2 and Adds.
| Test Method
Bituminous Materials _
: 04/13/16
| 05/21/18
09/15/16
09/15/16 |
94/02/18
04/02/18
» 04/13/16
04/02/18
06/02/16 -
04/02/18
04/02/18
_ 04/02/18
07/06/18 |
04/13/16
‘
11/07/18
05/11/16 |
Page 3 of 3
