403.1.3 | Night Item Removal
410 Bituminous Surface
Treatment
|
4i1i _ Pneumatic Tired
' Roller
417 Rumble Strip Iniay
Division 500
| Portland Cement
. Concrete
320
|
i
i
3.4.11 - 3.4.15 - Describes the
Intreduction of Recycled Materials at a
Batch Plant and Controls Minimurn Dry
Time for Recycled Aggregates (07/06/18)
3.5.2 & 3.5.2.1 - Revises Recycled
Materials Requirements (07/06/18)
3.10.10.1 ~ Removes penalty for failing
tack (06/06/17)
3.12 - Allows a reduction in use of
| pneumatic-tired rollers (06/06/17)
3.17.1.3 - Revises the NETTCP QA
Technologist requirements (11/07/18)
3.17.3.1.1 - Revises HMA gradation
specification limits, completes addition of
winter binder, removes allowance for Aim
change after two sub-lots (06/06/17)
4.1.1 - Removes reference to Night Items
(06/06/17)
Removes all references to Night Items in
Section 403
2.1 ~ Adopts new AASHTO Specifications
for Emutsions (04/13/26)
3.4.1.1 - Revises pavement conditions,
application rate for tack (01/04/17)
2.1.1, 2.1.2, 3.2, 3.3, 3.4 - Identifies
tack sarnpling and penalties for non-
conformance (06/06/17)
3,2 & 3.5,2 - Amends Distribution
Equipment and Initiates an Annual Tack
Truck Inspection Program (07/06/18)
1 3.5.5 - Requires the use of pneumatic
tired rollers on all Section 411 paving
(06/06/17)
5.1.1 - Ensures Tack Used for PMST and
Leveling Course is a Pay Item (07/06/18)
Removes Pay Items (04/02/18)
2.1 & 3.7 - Specifies PMST as the asphalt
inlay to fill in rumbie strips
3.1.6.2.1.2 A ~ Revise NETTCP QA
Technologist requirements (11/07/18)
3.8.1.1 - Revises the acceptable concrete
delivery temp to 90 degrees Fahrenheit
| (04/02/18)
06/06/17 —
06/06/17 07/06/18 |
04/02/18 07/06/18 |
_ 04/02/18
04/02/18 | 11/07/18
Page 2 of 3