Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/3/2020 - P259

Finance Committee - Agenda - 6/3/2020 - P259

By dnadmin on Mon, 11/07/2022 - 13:30
Document Date
Fri, 05/29/2020 - 15:04
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/03/2020 - 00:00
Page Number
259
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060320…

2020 Sidewalk Program

Streets listed in General Conditions Section 6.02C, may not be opened or worked in
between the hours of 7:00 AM - 9:00 AM and 3:00 PM - 6:00 PM, Monday through
Friday of each week.

Requests for work beyond those hours normaily allowed on weekdays shall be made by
the CONTRACTOR at least 72 hours in advance.

Requests for work on Saturdays, Sundays and holidays shall be made at least one week
in advance, but are unlikely tc be approved without significant mitigating
circumstances.

CONTRACTOR should not assume requests for hours beyond the hours and days
normally allowed will be approved. Requests will be considered on a case by case
basis.

LIMITS OF WORK

Prior to the start of construction, the CONTRACTOR and Engineer shall field inspect
the existing conditions of all proposed sidewalk and ramp reconstruction locations to
determine the limits of work, including but not limited to the height of curb reveal and
width of landscape restoration at the Right-of-Way (ROW) side of the sidewalk, for all
proposed reconstruction areas.

SURVEY LAYOUT AND CONTROL

The City will provide initial layout of the ROW as needed.

The CONTRACTOR shail be responsible for the preservation of the ROW layout,
including all benchmarks, and control points. If any of the control points are disturbed by
the CONTRACTOR during the construction, the CONTRACTOR shall replace them at
no expense to the OWNER. Damaged or destroyed points, bench marks or stakes, or any
reference points damaged or made inaccessible by the progress of the construction shall
be replaced or transferred by the CONTRACTOR, subject to verification by the
ENGINEER. Replacement of any layout points shall be performed by or under the
direction of a NH Licensed Land Surveyor.

The CONTRACTOR shall perform all necessary layout work in order to construct all
elements of the Project as shown on the Plans and specified in the Contract. This work
shall include, but shall not be limited to, stakeout necessary to establish lines and grades
as earthwork operations progress; stakeout, layout and elevations as required for
installing all items included m the work.