PROSECUTION OF WORK
DESCRIPTION OF WORK
The contract work includes the limits on the various streets listed in the Schedule of Values, The
specified pavement treatment is crack sealing.
The City reserves the right to remove streets from the list, extend or reduce limits on individual
streets, or revise the specified pavement treatment on individual streets.
The City may also add additional streets to the contract work.
Should the net projection of the value of changes to the contract work exceed the authorized
amount, the Owner will present a contract amendment proposal to the Contractor.
INTERIM MILESTONES FOR SUBSTANTIAL COMPLETION
The entire length of all roadway segments shall be substantially completed by August 21, 2020.
WORK HOURS
Reference is made to Section 6.02 Labor; Working Hours of the General Conditions.
Normal working hours shall be from 7:00 AM to 5:00 PM Monday through Friday. No
weekend, holiday or night work will be allowed without advance written approval of the City
Engineer.
Streets listed in General Conditions Section 6.02C, may not be opened or worked in between
the hours of 7:00 AM to 9:00 AM and 3:00 PM to 6:00 PM, Monday through Friday of each
week.
Requests for work beyond those hours normally allowed on weekdays shall be made by the
Contractor at least 72 hours m advance.
Requests for work on Saturdays, Sundays and holidays shall be made at least one week in
advance,
Contractor should not assume requests for hours beyond the hours and days normally allowed
will be approved. Requests will be considered on a case by case basis.
CONTFRACTOR’S REPRESENTATIVE
The Contractor shall designate a representative who will be available to respond to emergency
calls by the Owner at any time day and night and on weekends and holidays should such a
situation arise.
Should the City determime action by the City is needed or other costs are incurred because the
Contractor’s Representative is not available, the City will back-charge the Contractor for
associated expenses,
POW - 1 of 2