ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS
7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.
B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress, and performance of the Work.
Cc. CONTRACTOR is familiar with and is satisfied as to ali federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.
D, CONTRACTOR has carefully studied all (if any): (1) reports of explorations and tests of
subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which
have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
Conditions and (2) reports and drawings of Hazardous Environmental Condition, if any, at the Site which has
been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.
E, CONTRACTOR is entitled to rely upon the general accuracy of the “technical data” as
provided in paragraph 4.2 of the General Conditions. CONTRACTOR acknowledges that such reports and
drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes.
CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the
accuracy or completeness of information and data shown or indicated in the Contract Documents with respect
to Underground Facilities at or contiguous to the site.
F, CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data
concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which
may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods,
techniques, sequences and procedures of construction, if any, expressly required by the Contract Documents
to be employed by CONTRACTOR, and safety precautions and programs incident thereto.
G. CONTRACTOR does not consider that any further examinations, investigations, explorations,
tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract
Times, and in accordance with the other terms and conditions of the Contract Documents.
H. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
others at the Site that relates to the Work as indicated in the Contract Documents.
I. CONTRACTOR has correlated the information known to CONTRACTOR, information and
observations obtained from visits to the Site, reports and drawings identified in the Contract Documents and
all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.
J. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution
thereof by ENGINEER is acceptable to CONTRACTOR.
AG-4of7