fuie nausea Doc# — PCO.30
Seeger asrabnaieacece Ref. Document:
PROJECT NAME: Date: 8-Jul-20
Nashua Energy Recovery
PROJECTNO: 181012
PHASE
COST SUMMARY SHEET
Gas Level Transmitter
A MC Labor {Recap Sheet): $1,651.25
B McC Materials, & Equipment (Recap Sheet): $192.00
c MC Fee (A x 15%} + (B x 15%): $276.49
DB Subtotal MC Work {A+B+C): | 3 2,119.74
E Total Subcontractors (Below): $5,001.93
F Mc Mark-up on Subcontractor Work (5%, 7.5% or 10%): | $ 434,95
G Bond (1%) and General Liability (1%): $151.13
H Original FBS Location Credit $0.00
Total Proposal (D+E+F+G): § 7,f07.75
SUBCONTRACTOR SUMMARY
Subcontracter Description Amount
Gas Level Transmitter Conduit & Wire to
Eu PECTS. $ 5,001.93
§ -
§ -
§ ~
g -
§ -
Total Subcontractors: $ §,001.93