Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/5/2020 - P98

Finance Committee - Agenda - 8/5/2020 - P98

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
98
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

mh

ethuen PCO #025

Methuen
CONSTRUCTION

Methuen Construction Co,, inc. Project: 181012 - Nashua Energy Recovery Upgrade
144 Main Street - PO Box 960 2 Sawmill Rd.
Plaistow, New Hampshire 03865 Nashua, New Hampshire 03060

Phone; (803) 328-2229

Prime Contract Potential Change Order #025: Fuel Train Fabrication

1: City of Nashua FROM: Methuen Construction Co., Inc.
229 Main Street 144 Main Street PO Box 980
Nashua New Hampshire, 03066 Plaistow New Hampshire, 03865
PCO NUMBERIREVISION: 025/0 CONTRACT: _ 1FB0501-090618 NASHUA PO #146861-

Nashua Energy Recovery Upgrade
CREATED BY: Anthony Crespo (Methuen Construction Co.,

REQUEST RECEIVED FROM:

Inc.}

STATUS: Pending-InReview = = + GREATEDDATE: 6/30/2020
REFERENCE: = SS DATE SENT: eso20z000¢€@«C°~C~C~C~C~C—~S—
FIELDCHANGE: = No ~~~~~”~———:«&BRRIME CONTRACT None

CHANGE ORDER:
a geen vee ont sens ties ues ean ni Lee vee
SCHEDULE IMPACT: 10 days ACCOUNTING Amount Based

METHOD:
PAID IN FULL: No TOTALAMOUNT: $2,743.06

Methuen Construction (MC), hereby submits this PCO in accordance wilh the documentation referenced herein. itis expressly understood and agreed
that this proposal is valid for the time as specified within this decument from ihe date of the PCO. The Proposal Is based upon currant day construction
costs and does not include escalation costs for any material items that are either volatile or market sensitive. This Proposal does not Include overtime
acceleration or expediling costs. This proposal does not include ihe cosls associaied with oul of sequence construction, Interference, impact relafed
delays and disruptions. MC reserves its rights under the agreement to seek additional time, indirect and impact costs associated with the FCO, once the
impacts can be fully evaluated. This proposal Is submitted based on the understanding that itis exempt from WBE/MBE participation requirements and
acceptance of this proposal waives the participation requirements asscclated with this additianal work.

POTENTIAL CHANGE ORDER TITLE: Fuel Train Fabrication
CHANGE REASON: Design Development

POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract fs Changed As Follows)
CE #055 - PCO 25- Fue! Train Fabrication

Scope: Per RFW62, wa were required to fabricate and instali extra pipe and fittings to accommodate the meiric flanged connections on the generator

fuel trains. As a result of this, MC is requasting 10 additional days to be added ta the overall construction schedule due to delays in procurement of
necessary flanges.

ATTACHMENTS:

Burdan Rate
# Cost Cod B ip! Am Subtetat
os * eseription Type eunt {43,00% Appilos te Lagor,) Mente

22-0150 «
PROCESS

1 | PIPING SUBCONTRACTOR cubsontar $2,144.00 $9.00 $2,144.00
INSTALLATI

ON

22.0750 -
PROCESS
2 | PIPING EQUIPMENT Malenal 3 207.72 $0.00; $287.72
INSTALLATI
ON

Methuen Construction Co., Inc. page 1 of 2 Printed On: 6/30/2020 01:44 PM

Page Image
Finance Committee - Agenda - 8/5/2020 - P98

Footer menu

  • Contact