PCO #022
22-0150 -
PROCESS. Subcontract
3 EPIFING SUBCONTRACTOR or § 640.00 § 0.00 $640.00
INSTALLATI
ON
Subtotal: $1,353.38 $248.26 $1,601.62
GC Work Total Feo - Labor: 15.90% Agplles to Labor. 5 423,84
GC Work Total Fes - Matortal & Equipment: 45.00% Applies to Othar, Material, and Equipment, § 20.40
GC Subcontractors Work Fee: > 8.7% Applies to Subcontractor. 3 65.65
Bond & General Liability: 200% Applies to Othar, Material, Committed Costs, Labor, Rental Equipment Rellef, Equipment, Subcontracter, and Burden. 3 36.04
Grand Total: $1,837.55
Jeremy Smith, PE. (Waldron Engineering City of Nashua Methuen Construction Co,, Inc.
& Construction, Inc.)
37 Industrial Drive Suite G-1 229 Main Street 144 Main Street PO Box 980
Exeter, New Hampshire 03833
Nashua, New Hampshire 03060
Plaistow, New Hampshire 03865
SIGNATURE DATE
Methuen Construction Co., Inc.
SIGNATURE DATE
page 2 of 2
SIGNATURE DATE